Steel Day 2009

A good shot of our inner workings of our drill line  

Able Steel Detailer Rick Webb is set up out in the shop to show one ouf our SDS2 Stations 

Able Steel Employee Ernie King demonstrating our drill line to Architects from Architekton

Able Steel Employee Levi Ashley running the Burn Table while Estimator & PM "Cyle Clark" conducts a tour

Able Steel Employee Rick Harvey operating our Beam Line 

Able Steel enjoyed a good turn out at our Steel Day Celebration 

Able Steel's fleet actually all in the same place at the same time

Able Steel Project Manager Phil Figura (in camo hat) looks on as the Parkers enjoy their food and conversation

Able Steel Project Manager Terry Seibal with Sundt personnel Jessica, Kyle, Todd, Bill & Dave.

Able Steel's Vice President Mark Fultz stands by the drill line 

Able Steel's Plasma Burn Table in action 

Band saw completing a cut of a steel beam 

Good shot of the Cambering Machine

Jim Clark & Able's Owner Chuck Clark (left) as well as Jim Parker (middle) & Mark Fultz with Dan Ellington (right) 

Lincoln Welding had demonstrations going on the whole day

 Lincoln Welding had a super display set up

Steel Day Medallion was produced on our site's Burn Table

Ed with Midwestern Meats catered our event  

Vice President Mark Fultz and Detailer Rick Webb at the SDS2 station